Tower Defense Strategy - Chapter 288
The eastern plateau of Heizhou, Eth.
Since Eth broke away from the colonists, it has been famous for coffee planting and processing, but it is obvious that single agriculture cannot make a country with more and more people live a good life.
Developing industry is the only way out, but to develop industry, water is the top priority.
In the early days, Epy, as an agent of the empire, had the strongest military power in Heizhou, and forcibly delineated the largest amount of water drawn from the lower reaches. The countries along the river of life could only tremble because of their weak national strength.
But to be honest, in Heizhou, the courage of the commanders is sometimes more useful than military strength-because the quality of the army is too stretched, it is common for a thousand people to fight and only two or three people will die. , Military operations are pure waste of money, so everyone just talks about it.
A few years ago, as a few people awakened, Eth gradually introduced foreign capital to build roads and bridges, and after raising the per capita annual income to 500 A dollars, with a scale of 4 billion yuan of financial expenditure, it forcibly promoted the 6 billion A dollars reservoir plan, which detonated. Ended the Shuiyuankou Cannon War, which is still influential today.
History can prove that this is a far-sighted investment project. The reservoir not only provides the surrounding industrial water base, but its peak shaving effect actually benefits the downstream.
In fact, the elites of Epy also know that modern water conservancy will benefit the entire water system, but they are still trapped by more and more radical public sentiments. If it reaches the point where internal problems cannot be reconciled, it may really be a battle.
Now, the reservoir will once again prove that it can play a greater role in promoting the progress of the entire region.
Here, the largest water solar power station in Heizhou will be built!
Water solar power station is a relatively new concept, and only a few regions in the world have certain construction needs.
Its biggest advantage is that it can reduce water evaporation by avoiding direct sunlight, which is of strategic significance for areas with insufficient water sources.
Secondly, when the scale of the water solar power station is large enough, it can also effectively improve the water quality. A large area of water that lacks light for a long time, algae cannot survive, and naturally there will be no ecological chain centered on algae. This environment is conducive to material sedimentation, and can also avoid the downstream ecological disasters caused by excessive algae reproduction. To protect the secondary role of the water flow generator set.
There are also disadvantages.
Water photoelectricity is affected by waves, and it is difficult to create a structure that automatically collimates with the sun. When tiled, the same power generation will naturally be more expensive than terrestrial radio and television systems, and the maintenance cost will be higher.
As far as Eth is concerned, the needs and advantages of making water-based photovoltaics are obvious.
The demand stems from the good population growth in his family…Well, it is the inadequacy of education and household appliances, especially TV sets, which brought about superbirth.
More than a decade ago, scientists predicted the next world war. The goal is likely to be to grab fresh water sources. Of course, the most dangerous area is the area with the highest population growth rate.
As the population of the entire basin rises year by year, if everyone is unwilling to go back to the tribal era, the contradictions will inevitably become more and more irreconcilable. If there is no monster crisis, it will be sooner or later that the conflict will detonate.
So even if it is to avoid being used as a target for fire in the basin area, Eth has reasons to build a project to reduce water evaporation.
The advantage is that this reservoir was slowly accumulated in multiple rainy seasons after the dam was completed, and a stable and huge fishery industry chain has not yet been formed. Therefore, there are relatively few obstacles in all aspects when the project is demonstrated.
By the way, Eth, like country A, is a federal system, which is similar to a model where many countries live together.
Under this model, local opposition forces are sometimes so strong that the national policy cannot be pushed forward.
At this stage, it was not the time for Eth to build a super-large surface photoelectric.
The cost per kilowatt of solar energy paving is twice that of thermal power stations. Not only can power generation be used during the day, but the impact of cloudy, heavy rain and other weather will also reduce the power generation by more than 90%. Obviously, it can only be used as a part of the complex energy system. . Otherwise, the thermal power station will only stop and start to supplement the shortage, which will cause the device life to be reduced and malfunction, and it will be enough to drink a pot.
Kinetic energy storage?
I’m sorry, Tuqiu’s existing kinetic energy storage technology has not yet been able to be applied to power stations that generate too much power. In fact, there are kinetic energy storage photovoltaic power stations of a certain scale in operation. They are not direct photovoltaics, but solar versions of boiling water technology, which are more like household solar water heaters. Affected by waves on the water surface, it is difficult to connect with hard pipes, and it is technically impossible to achieve continuous and stable production of high-pressure steam from solar energy.
Eth insisted on constructing despite the trouble, but the pressure was increasing.
As various places in Heizhou have been ravaged by monsters many times, everyone has discovered that the plateau is a good place.
This kind of cognition brings population pressure beyond the natural growth of Eth, and it is obvious that it will intensify. If you don’t do anything, you might not have to wait for the monster to hit the plateau and kill yourself for water and electricity.
Choosing the water photoelectric project is also because the additional population growth will accelerate the maturity of the fishery in the reservoir area. When the time comes, we will want to build it, let alone protest, and mutiny is possible.
At the beginning of the year, all parties of Eth completed coordination and contacted the embassy of country C to contact relevant qualified enterprises to work.
Bidding?
does not exist.
Although the western media has been using debt traps as a reason for a demon for more than ten years, everyone has eyes and brains. Who uses debt to impose improper requirements such as targeted tariff reduction or exemption? Who uses investment to destroy local industries? Blowing cannot be the truth.
The investment in country C is too simple. To build a highway, let her operate the road for 30 years, and build a power plant to operate a power plant for 30 years. Mining and dams are the same. As long as they can keep the contract, they will invest next time. In addition, it seems that some electricity and toll revenues have been lost in the short term. In the long run, infrastructure is completely useless. In the process, a large number of local young people will be trained to become skilled workers, and it can even help Eth save a lot of education subsidies.
So who will do it? There is nothing to say. At most, a few companies from country C will bid on their own.
After several months of feasibility studies, surveys, etc., in August, Shuiguang Optoelectronics finally started.
The total installed capacity of the project is 500 MW, equipped with a tetraploid sodium battery power station for peak shaving with a storage capacity of 30 MWh, and the construction of related electrical towers and power grids around it is also the same project.
The total project amount is 14 billion C currency, and it can be regarded as a national-level project if it is placed in Eth, a financially tight place.
There was an additional project that followed, and after a little discussion within Eth, it was decided.
Undertaken by another company, construction will start after the power storage station is completed. A group of four electromagnetic turrets facing the west and northwest of the plateau will be constructed, as well as fifty electromagnetic positions near several transportation hubs across the border.
You don’t need to be fooled. Country C is also building this thing.
Compared with the standard of electromagnetic guns for vehicles, of course it is more powerful.
This is a heavy artillery with a projectile that can maintain five times the speed of sound at a distance of 30 kilometers. The end of the projectile has a weight of five kilograms. It uses the gas supplement technology suggested by the NPC before. It uses the increased wake pressure to counter the speed zone of tens of Mach. The huge slowdown came.
Speaking of which, it is quite rough to do it.
The aerodynamic heating effect of electromagnetic projectiles is far from comparable to that of ordinary aircraft. So far, human beings have never tried to perform operations such as ignition at such speed and heating environment (outer space is not counted).
A lot of failures and a lot of problems were solved. The guns that were made could not be miniaturized for the time being, and could only be made into forts.
Although it cannot cause significant damage to monsters tens of kilometers away, it can be regarded as a supplement to the existing artillery system, and related scientists have stated that in the future, projectiles will be improved to increase the range and end-strike capability, and the turret will not be wasted.
In addition, the project team did not come from ancient times. They knew that there was a problem with the survivability of the fixed gun.
The form of the turret is mainly to rely on the power supply of the local power grid to achieve strong firepower. The gun body itself is not immobile~www.mtlnovel.com~ Including related equipment and capacitor battery packs, three container trailers can be towed. go.
The related design makes it possible for the electromagnetic turret to be deployed again at least.
Another thing in this project, the electromagnetic field, is also a new system.
The electromagnetic field is a kind of power grid terminal used to dock electromagnetic tanks, and it is no problem to use it as a military charging pile.
A standard electromagnetic position can support up to six electromagnetic tanks at the same time, but the total current is fixed, and can only support an unlimited attack of two electromagnetic tanks at a speed of 15 rounds per minute. According to different types of battery packs, the lower the storage capacity, the more it is necessary to reduce the number as much as possible.
According to the plan of Country C, at least fifty to eighty positions must be deployed around a large coastal city to accommodate a ground combat group capable of fighting against small monsters.
The infrastructure on Eth’s side is still a bit short. Dozens of repairs are enough to assist the army in destroying the leaked first-level monsters. The second-level monsters still have to rely on metal hydrogen bombs and space-based support.
As a military project, it is of course impossible to be operated by country C, but it is necessary to leave a military steering group to build a set of relevant soldier regulations.